Reseda – West Van Nuys, Los Angeles: ADU permit timelines
Across 2,025 issued Accessory Dwelling Unit permits in Reseda – West Van Nuys, applications averaged 155 calendar days (35 days shorter than the Los Angeles citywide average of 190 days), with 63% exceeding California’s 60-day review window under Gov. Code § 66317.
- 12,636 total LADBS permits in area
- 2,025 issued ADUs
- 1,273 ADUs over 60 days
- Updated Nov 14, 2026
Compare all 15 Los Angeles Council districts
Computed from City of Los Angeles Department of Building and Safety (LADBS) submittal and issuance dates in Los Angeles Open Data.
From City of Los Angeles Open Data (LADBS), as of November 14, 2026.
- Issued ADUs measured
- 2,025
- Average wait
- 155 days
- Over 60-day statutory window
- 63%
- Declared ADU valuation
- $125.5 million
Recent ADU permit filings in Reseda – West Van Nuys
The 15 most recently submitted Accessory Dwelling Unit filings recorded by LADBS in Reseda – West Van Nuys. You can select any filing below to calculate its 60-day statutory deadline and prepare a written status request.
| Permit number | Address | Submitted | Status | Elapsed | Declared value |
|---|---|---|---|---|---|
| 25016-20003-04842SUPPLEMENTAL PERMIT TO 25016 - 20000 - 04842 TO REVISE PLANS AND STRUCTURAL PLANS | 19012-19012 1/2 W KESWICK STZone RA-1 | Nov 12, 2026 | Issued | 0 days | $501 |
| 26010-20001-04269SUPPLEMENTAL PERMIT TO 26010-20000-04269. REVISE WORK DESCRIPTION: ADDITION TO (E) SFD FOR BREEZEWAY AND ATTACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33 (c)and (e). "COMPLY WI | 6439-6441 N ZELZAH AVEZone R1-1-RIO | Oct 19, 2026 | Issued | 11 days | $17,000 |
| 26016-20000-29096CONVERT DETACHED GARAGE INTO ACCESSORY DWELLING UNIT PER GC 66323(a)(1) "COMPLY WITH DEPARTMENT ORDER effective date 07/22/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". | 6443 N ZELZAH AVEZone R1-1-RIO | Oct 19, 2026 | Issued | 11 days | $25,000 |
| 26014-20000-03954CONVERT (E) DETACHED GARAGE AND ADDITION TO ACCESSORY DWELLING UNIT PER GC 66323(a)(2) | 7821 N LOUISE AVEZone R1-1 | Oct 15, 2026 | Issued | 11 days | $70,000 |
| 26014-20001-02587supp. to 26014-20000-02587 to add engieer of record , no fee dept error . | 7658 N OSTROM AVEZone R1-1 | Oct 14, 2026 | Issued | 0 days | — |
| 26016-20000-27980REMODEL TO (E) SFD | 6657-6659 N ZELZAH AVEZone R1-1-RIO | Oct 9, 2026 | Issued | 17 days | $45,000 |
| 26010-20000-05096NEW DETACHED IRREGULAR SHAPED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(b)(1). | 18035 W GAULT STZone R1-1 | Oct 8, 2026 | Issued | 29 days | $100,000 |
| 25016-20001-36481SUPPL. PERMIT TO 25016-20000-36481. REVISE FLOOR PLAN, FRAMING PLAN. REBUILD ATTACHED CARPORT. | 17836 W VANOWEN STZone R1-1-RIO | Oct 7, 2026 | Issued | 0 days | $3,000 |
| 25010-30002-01389Supplemental to 25010-20000-01389to capture height change in the structural inventory. *** Department error NO FEE *** | 7858 N WILBUR AVEZone RA-1 | Oct 2, 2026 | Permit Finaled | 0 days | — |
| 26014-20001-01289SUPPLEMENTAL PERMIT TO 26014-20000-01289 TO REVISE PLANS FOR ENTIRELY NEW ROOF FRAMING W/ NEW ROOF SLOPE/ORIENTATION. CONSTRUCTION DESIGN PER ENGR. | 7341 N BAIRD AVEZone R1-2 | Oct 1, 2026 | Issued | 36 days | $10,000 |
| 26014-10001-00560eplan. Supplemental permit to 26014-10000-00560 to reduce size of ADU. | 6929 N GARDEN GROVE AVEZone R1-1-RIO | Sep 30, 2026 | Issued | 41 days | — |
| 26010-20000-04906NEW DETACHED 1-STORY ACCESSORY DWELLING UNIT PER GCS 66323(A)(2). ALL WORK DONE PER ENGINEERING. | 18234 W LULL STZone R1-1 | Sep 25, 2026 | Issued | 31 days | $90,000 |
| 25014-20001-03091SUPPLEMENTAL PERMIT TO REVISE DESIGN AND SETBACK PER SURVEY FOR THE ACCESSORY DWELLING UNIT | 6445 N WILBUR AVEZone R1-1-RIO | Sep 25, 2026 | Issued | 0 days | — |
| 26014-20000-03699ADDITION TO AND CONVERT ATTACHED GARAGE TO ACCESSORY DWELLING UNIT PER GCS 66323(a)(1) FOR EX. SFD. | 19440-19442 W LEMAY STZone R1-1-RIO | Sep 25, 2026 | Issued | 18 days | $40,000 |
| 25010-10001-05744**ePlan****SUPP PERMIT TO 25010-10000-05744, Side setback facing South adjusted from initially proposed 5 to 5 - 2 as to match currently partially built condition. Nothing else cha | 6236 N ENFIELD AVEZone R1-1-RIO | Sep 24, 2026 | Issued | 18 days | $1 |
Check a Los Angeles building permit live
Search any permit number or street address in the City of Los Angeles Open Data registry. Your address stays in this browser tab and is never added to a link or stored.
60-day ADU shot-clock calculator & written notice
California Government Code § 66317 gives local permitting agencies 60 calendar days to ministerially approve or deny a complete Accessory Dwelling Unit application. Enter your application details below to calculate your statutory deadline and assemble a plain written status request for Reseda – West Van Nuys, Los Angeles.
- Submittal date
- November 23, 2026
- Day 45 check-in
- January 7, 2027
- Day 60 statutory deadline
- January 22, 2027
- Current status
- 60 days remaining in the 60-day window
Review written notice to LADBS Plan Check Supervisor
November 23, 2026
To: Plan Check Supervisor
Los Angeles Department of Building and Safety (LADBS)
201 N. Figueroa Street, Los Angeles, CA 90012
CC: California Department of Housing and Community Development (HCD) Housing Accountability Unit
Subject: Request for Ministerial ADU Review Status & Consolidated Corrections Under CA Gov. Code § 66317 — Permit #[PERMIT APPLICATION NUMBER]
Dear Plan Check Supervisor,
I am writing regarding Accessory Dwelling Unit (ADU) Permit Application #[PERMIT APPLICATION NUMBER] for [PROPERTY STREET ADDRESS, LOS ANGELES, CA], submitted on November 23, 2026.
Under California Government Code § 66317, the 60-day ministerial review window for a complete ADU application runs through January 22, 2027.
Pursuant to California Government Code § 66317, I respectfully request:
1. Immediate ministerial approval of this complete ADU application, OR
2. A single, complete, written set of objective code comments citing the exact code section for every remaining item so that all corrections can be resolved without serial plan-check cycles.
Please respond in writing with the current plan-check status, assigned plan checker, and next action date.
Sincerely,
[YOUR FULL NAME]
Permit Reference: #[PERMIT APPLICATION NUMBER]
Property Address: [PROPERTY STREET ADDRESS, LOS ANGELES, CA]
Election.org publishes official City of Los Angeles permit data and California statutory references for public accountability and citizen self-help. This draft is informational and is not legal representation; review every detail before sending.
Other Los Angeles Community Plan Areas
- West Adams – Baldwin Hills – Leimert, Los Angeles2,613 issued ADUs · 204 days average · 67% over 60 days
- South Los Angeles, Los Angeles2,603 issued ADUs · 217 days average · 72% over 60 days
- Northeast Los Angeles, Los Angeles2,334 issued ADUs · 229 days average · 69% over 60 days
- Wilshire, Los Angeles2,286 issued ADUs · 197 days average · 68% over 60 days
- Canoga Park – West Hills – Winnetka – Woodland Hills, Los Angeles2,021 issued ADUs · 155 days average · 60% over 60 days
- North Hollywood – Valley Village, Los Angeles1,890 issued ADUs · 171 days average · 61% over 60 days
Up: All Los Angeles permit timelines, Los Angeles officials, Local government
Sources & notes
Permit registryCity of Los Angeles Department of Building and Safety (LADBS) via City of Los Angeles Open Data
Open data endpointdata.lacity.org/resource/pi9x-tg5x.json
StatuteCalifornia Government Code § 66317 (60-day ministerial ADU review)
Data updatedNov 14, 2026