Hollywood, Los Angeles: ADU permit timelines
Across 1,074 issued Accessory Dwelling Unit permits in Hollywood, applications averaged 217 calendar days (27 days longer than the Los Angeles citywide average of 190 days), with 69% exceeding California’s 60-day review window under Gov. Code § 66317.
- 26,211 total LADBS permits in area
- 1,074 issued ADUs
- 741 ADUs over 60 days
- Updated Nov 14, 2026
Compare all 15 Los Angeles Council districts
Computed from City of Los Angeles Department of Building and Safety (LADBS) submittal and issuance dates in Los Angeles Open Data.
From City of Los Angeles Open Data (LADBS), as of November 14, 2026.
- Issued ADUs measured
- 1,074
- Average wait
- 217 days
- Over 60-day statutory window
- 69%
- Declared ADU valuation
- $73.1 million
Recent ADU permit filings in Hollywood
The 15 most recently submitted Accessory Dwelling Unit filings recorded by LADBS in Hollywood. You can select any filing below to calculate its 60-day statutory deadline and prepare a written status request.
| Permit number | Address | Submitted | Status | Elapsed | Declared value |
|---|---|---|---|---|---|
| 26010-20001-04425NO FEE DEPT. ERROR-SUPPL. PERMIT TO 26010-10000-04425 TO CLARIFY REAR YARD SETBACKS. | 2543 N PARK OAK DRZone RE9-1D-HCR | Nov 12, 2026 | Issued | 0 days | — |
| 25014-30001-04140Supplemental ref to PCIS#: 25014-30000-04140 to "Revise and update structural inventory"**No Fee Department Error** | 6554 W BARTON AVEZone R2-1XL | Nov 5, 2026 | Permit Finaled | 0 days | — |
| 25010-10001-04375NO FEE DEPARTMENT ERROR. SUPPLEMENTAL PERMIT TO 25010-10000-04375 TO REVISE METHANE SYSTEM TO METHANE SITE DESIGN EXEMPT. | 609 N STANLEY AVEZone R1-1-O | Nov 3, 2026 | Permit Finaled | 0 days | — |
| 23010-10002-04291EPLANSUPPLEMENTAL TO 23010-10000-04291 TO REVISE FLOOR FRAMING ON S2.1 | 4035 W MARATHON STZone RD1.5-1XL | Oct 22, 2026 | Issued | 6 days | $501 |
| 25014-10002-00519SUPPLEMENTAL PERMIT TO 25014-30000-00519 TO CHANGE THE ROOF DESIGN TO VAULTED CEILING, UPDATE STRUCTURAL PLAN AND DETAIL. | 1948 N VINE STZone R2-1XL | Oct 15, 2026 | Issued | 0 days | $501 |
| 25010-30002-02164supplemental permit to 25010-30000-02164 to update structural framing plans | 7531 W FRANKLIN AVEZone RE9-1-HCR | Oct 7, 2026 | Issued | 0 days | $2,501 |
| 25014-30001-05026Supplemental to 25014-10000-05026 to update the mathane level in the structural inventory. No fee Department error. ***SEE COMMENTS*** | 541 1/4-1/2 N POINSETTIA PLZone R1V2 | Sep 29, 2026 | Issued | 0 days | — |
| 25014-10002-04716ePlan. Supplemental to 25014-10000-04716 to revise height from 21'6" to 23'-7" per existing site conditions and to correct address from "5034 1/2 Lemon Grove" to "5034 - 5036 Lemo | 5034-5036 W LEMON GROVE AVEZone R1-1 | Sep 28, 2026 | Issued | 23 days | $501 |
| 25014-30001-05192Supplemental permit to 25014-30000-05192 For 3 New Structural piles and concrete shotcrete wall | 1457-1459 N SUNSET PLAZA DRZone RE11-1-HCR | Sep 22, 2026 | Issued | 0 days | $4,000 |
| 25010-30002-00391SUPPLEMENTAL PERMIT TO #25010-30000-00391 TO REMOVE "SOLAR PV COMBO" PERMIT FLAG FROM THE CHECKLIST - NO PV SYSTEM REQUIRED PER TITLE 24 ENERGY CALCULATIONS*NO FEE DEPARTMENT ERROR | 7120 W HOLLYWOOD BLVD 1-8Zone R3-1 | Sep 11, 2026 | Permit Finaled | 0 days | — |
| 26014-10001-00381ePlan. Supplemental Permit to 26014-10000-00381 for structural framing member sizes. No change to the exterior, shape, or size. | 4436 1/4-1/2 W CAMERO AVEZone R2-1XL | Sep 10, 2026 | Issued | 35 days | — |
| 24014-10002-05652Supplemental permit to 24014-10000-05652: removal of pool from scope of work and deck layout revisal. No longer grading the site. | 2624 N ST GEORGE STZone R2-1XL | Sep 2, 2026 | Issued | 49 days | $501 |
| 24016-20001-31210SUPPLEMENTAL PERMIT TO 24016-10000-31210. TO REVISE THE FLOOR AND FRAMING PLANS TO INCLUDE INTERIOR PARTITION AND REMOVE OPENING. | 2310 N COMMONWEALTH AVEZone R1-1 | Sep 2, 2026 | Issued | 6 days | $3,000 |
| 25010-10001-04125EPLAN: Supplemental to permit: 25010-10000-04125 to change (2) sliding doors to windows and change T-24 to all electric | 1168 1/2-3/4 N EDGEMONT STZone RD1.5-1XL | Aug 28, 2026 | Issued | 4 days | $5,000 |
| 26010-10000-04425NEW 1 STORY DETACHED ADU PER WFPP WITH NFPA 13D THROUGH-OUT (State ADU, New Construction, GC 66323(a)(2)) | 2543 N PARK OAK DRZone RE9-1D-HCR | Aug 26, 2026 | Issued | 51 days | $100,000 |
Check a Los Angeles building permit live
Search any permit number or street address in the City of Los Angeles Open Data registry. Your address stays in this browser tab and is never added to a link or stored.
60-day ADU shot-clock calculator & written notice
California Government Code § 66317 gives local permitting agencies 60 calendar days to ministerially approve or deny a complete Accessory Dwelling Unit application. Enter your application details below to calculate your statutory deadline and assemble a plain written status request for Hollywood, Los Angeles.
- Submittal date
- November 23, 2026
- Day 45 check-in
- January 7, 2027
- Day 60 statutory deadline
- January 22, 2027
- Current status
- 60 days remaining in the 60-day window
Review written notice to LADBS Plan Check Supervisor
November 23, 2026
To: Plan Check Supervisor
Los Angeles Department of Building and Safety (LADBS)
201 N. Figueroa Street, Los Angeles, CA 90012
CC: California Department of Housing and Community Development (HCD) Housing Accountability Unit
Subject: Request for Ministerial ADU Review Status & Consolidated Corrections Under CA Gov. Code § 66317 — Permit #[PERMIT APPLICATION NUMBER]
Dear Plan Check Supervisor,
I am writing regarding Accessory Dwelling Unit (ADU) Permit Application #[PERMIT APPLICATION NUMBER] for [PROPERTY STREET ADDRESS, LOS ANGELES, CA], submitted on November 23, 2026.
Under California Government Code § 66317, the 60-day ministerial review window for a complete ADU application runs through January 22, 2027.
Pursuant to California Government Code § 66317, I respectfully request:
1. Immediate ministerial approval of this complete ADU application, OR
2. A single, complete, written set of objective code comments citing the exact code section for every remaining item so that all corrections can be resolved without serial plan-check cycles.
Please respond in writing with the current plan-check status, assigned plan checker, and next action date.
Sincerely,
[YOUR FULL NAME]
Permit Reference: #[PERMIT APPLICATION NUMBER]
Property Address: [PROPERTY STREET ADDRESS, LOS ANGELES, CA]
Election.org publishes official City of Los Angeles permit data and California statutory references for public accountability and citizen self-help. This draft is informational and is not legal representation; review every detail before sending.
Other Los Angeles Community Plan Areas
- West Adams – Baldwin Hills – Leimert, Los Angeles2,613 issued ADUs · 204 days average · 67% over 60 days
- South Los Angeles, Los Angeles2,603 issued ADUs · 217 days average · 72% over 60 days
- Northeast Los Angeles, Los Angeles2,334 issued ADUs · 229 days average · 69% over 60 days
- Wilshire, Los Angeles2,286 issued ADUs · 197 days average · 68% over 60 days
- Reseda – West Van Nuys, Los Angeles2,025 issued ADUs · 155 days average · 63% over 60 days
- Canoga Park – West Hills – Winnetka – Woodland Hills, Los Angeles2,021 issued ADUs · 155 days average · 60% over 60 days
Up: All Los Angeles permit timelines, Los Angeles officials, Local government
Sources & notes
Permit registryCity of Los Angeles Department of Building and Safety (LADBS) via City of Los Angeles Open Data
Open data endpointdata.lacity.org/resource/pi9x-tg5x.json
StatuteCalifornia Government Code § 66317 (60-day ministerial ADU review)
Data updatedNov 14, 2026