Sherman Oaks – Studio City – Toluca Lake – Cahuenga Pass, Los Angeles: ADU permit timelines
Across 810 issued Accessory Dwelling Unit permits in Sherman Oaks – Studio City – Toluca Lake – Cahuenga Pass, applications averaged 174 calendar days (16 days shorter than the Los Angeles citywide average of 190 days), with 66% exceeding California’s 60-day review window under Gov. Code § 66317.
- 16,697 total LADBS permits in area
- 810 issued ADUs
- 535 ADUs over 60 days
- Updated Nov 14, 2026
Compare all 15 Los Angeles Council districts
Computed from City of Los Angeles Department of Building and Safety (LADBS) submittal and issuance dates in Los Angeles Open Data.
From City of Los Angeles Open Data (LADBS), as of November 14, 2026.
- Issued ADUs measured
- 810
- Average wait
- 174 days
- Over 60-day statutory window
- 66%
- Declared ADU valuation
- $44.0 million
Recent ADU permit filings in Sherman Oaks – Studio City – Toluca Lake – Cahuenga Pass
The 15 most recently submitted Accessory Dwelling Unit filings recorded by LADBS in Sherman Oaks – Studio City – Toluca Lake – Cahuenga Pass. You can select any filing below to calculate its 60-day statutory deadline and prepare a written status request.
| Permit number | Address | Submitted | Status | Elapsed | Declared value |
|---|---|---|---|---|---|
| 24010-20002-02903* NO FEE. DEPARTMENT ERROR.* SUPPLEMENTAL PERMIT TO 24010-20000-02903 TO REVISE WORK DESCRIPTION TO "NEW 15'-8" X 37'-6" 1-STORY ACCESSORY DWELLING UNIT. NFPA 13D FIRE SPRINKLERS T | 4536 N WORTSER AVEZone R1-1-RIO | Nov 3, 2026 | Permit Finaled | 0 days | — |
| 26014-20001-02313SUPPLEMENTAL PERMIT TO 26014-20000-02313 TO REVISE THE FOUNDATION PLANS AND FOOTING DETAILS OF THE EXISTING PORTION OF BUILDING | 4354 N CAMELLIA AVEZone R1-1-RIO | Oct 21, 2026 | Issued | 0 days | $2,501 |
| 25014-20003-00184SUPPLEMENTAL PERMIT TO #25014-20000-00184 TO REVISE HEIGHT | 4242 1/2 N SUNNYSLOPE AVEZone R1-1-RIO | Oct 19, 2026 | Issued | 0 days | $501 |
| 25014-10002-05434EPLAN: SUPPLEMENTAL PERMIT TO 25014 - 10000 - 05434 TO REVISE STRUCTURAL PLANS | 3894 N DIXIE CANYON AVEZone R1-1 | Oct 7, 2026 | Issued | 1 days | $501 |
| 24014-20002-01481SUPPLEMENTAL PERMIT TO #24014-20000-01481 TO REVISE ROOFING | 4274-4274 1/2 N TUJUNGA AVEZone [T][Q]RD1.5-1VL-RIO | Oct 1, 2026 | Issued | 18 days | $501 |
| 26016-10000-25578CONVERT (E) GARAGE TO ACCESSORY DWELLING UNIT PER GC 66323(a)(1). | 4168 N BAKMAN AVEZone R1-1-RIO | Sep 21, 2026 | Issued | 36 days | $80,000 |
| 26016-20001-23579SUPPLEMENTAL PERMIT TO 26016-20000-23579 TO UPDATE THE OWNER INFORMATION. ***NO FEE DEPARTMENT ERROR*** | 4747 N NORWICH AVEZone R1-1 | Sep 18, 2026 | Issued | 0 days | — |
| 24010-10001-05209SUPPLEMENTAL TO 24010-10000-05209 update T24 to include gas cooktop and gas dryer in ADU | 13743 N SEVY LANEZone RE40-1-H | Sep 17, 2026 | Issued | 15 days | $5,000 |
| 25014-10001-05434EPLAN: SUPPLEMENTAL TO PERMIT 25014 - 10000 - 05434 TO REVISE PLANS AND STRUCTURAL | 3894 N DIXIE CANYON AVEZone R1-1 | Sep 15, 2026 | Issued | 9 days | $2,500 |
| 25016-20002-27745SUPPL. PERMIT TO 25016-20000-27745 TO REVISE STRUCTURAL DETAILS | 3210-3214 N DE WITT DRZone CR-1VL | Sep 8, 2026 | Issued | 0 days | $2,501 |
| 21014-30003-01099Supplemental ref to PCIS#: 24014-30000-01099 to " Revise structural foundation, framing plans and details" | 7006-7008 W MACAPA DRZone RE15-1-H | Sep 3, 2026 | Issued | 0 days | $2,501 |
| 26016-20000-23579FOUNDATION REPAIR & UPGRADE TO (E) ACCESSORY DWELLING UNIT UNDER #25014-10000-01181. ALL WORK DONE PER ENGINEERING | 4747 N NORWICH AVEZone R1-1 | Sep 2, 2026 | Issued | 15 days | $10,000 |
| 25014-20001-04239SUPP TO PERMIT 25014-20000-04239 TO REVISE THE BLDG HEIGHT IN STR INVENTORY; NO FEE DEPT ERROR | 4512-4514 N CEDROS AVEZone R1-1-RIO | Aug 28, 2026 | Permit Finaled | 0 days | — |
| 24014-20001-01481ePlan: SUPPLEMENTAL PERMIT TO #24014-20000-01481 TO REVISE EXTENT OF DEMO AND REPLACE | 4276 N TUJUNGA AVEZone [T][Q]RD1.5-1VL-RIO | Aug 24, 2026 | Issued | 28 days | $2,501 |
| 25014-20002-05444SUPPL. PERMIT TO 25014-20000-05444 TO SHOW THE CORRECT SIZE OF THE (E) ROOF RAFTERS AND PROVIDE NEW CEILING JOIST SISTERED TO THE EXISTING FOR ATTIC ACCESS OPENING. | 4524 N CALHOUN AVEZone R1-1-RIO | Aug 14, 2026 | Issued | 0 days | $2,501 |
Check a Los Angeles building permit live
Search any permit number or street address in the City of Los Angeles Open Data registry. Your address stays in this browser tab and is never added to a link or stored.
60-day ADU shot-clock calculator & written notice
California Government Code § 66317 gives local permitting agencies 60 calendar days to ministerially approve or deny a complete Accessory Dwelling Unit application. Enter your application details below to calculate your statutory deadline and assemble a plain written status request for Sherman Oaks – Studio City – Toluca Lake – Cahuenga Pass, Los Angeles.
- Submittal date
- November 23, 2026
- Day 45 check-in
- January 7, 2027
- Day 60 statutory deadline
- January 22, 2027
- Current status
- 60 days remaining in the 60-day window
Review written notice to LADBS Plan Check Supervisor
November 23, 2026
To: Plan Check Supervisor
Los Angeles Department of Building and Safety (LADBS)
201 N. Figueroa Street, Los Angeles, CA 90012
CC: California Department of Housing and Community Development (HCD) Housing Accountability Unit
Subject: Request for Ministerial ADU Review Status & Consolidated Corrections Under CA Gov. Code § 66317 — Permit #[PERMIT APPLICATION NUMBER]
Dear Plan Check Supervisor,
I am writing regarding Accessory Dwelling Unit (ADU) Permit Application #[PERMIT APPLICATION NUMBER] for [PROPERTY STREET ADDRESS, LOS ANGELES, CA], submitted on November 23, 2026.
Under California Government Code § 66317, the 60-day ministerial review window for a complete ADU application runs through January 22, 2027.
Pursuant to California Government Code § 66317, I respectfully request:
1. Immediate ministerial approval of this complete ADU application, OR
2. A single, complete, written set of objective code comments citing the exact code section for every remaining item so that all corrections can be resolved without serial plan-check cycles.
Please respond in writing with the current plan-check status, assigned plan checker, and next action date.
Sincerely,
[YOUR FULL NAME]
Permit Reference: #[PERMIT APPLICATION NUMBER]
Property Address: [PROPERTY STREET ADDRESS, LOS ANGELES, CA]
Election.org publishes official City of Los Angeles permit data and California statutory references for public accountability and citizen self-help. This draft is informational and is not legal representation; review every detail before sending.
Other Los Angeles Community Plan Areas
- West Adams – Baldwin Hills – Leimert, Los Angeles2,613 issued ADUs · 204 days average · 67% over 60 days
- South Los Angeles, Los Angeles2,603 issued ADUs · 217 days average · 72% over 60 days
- Northeast Los Angeles, Los Angeles2,334 issued ADUs · 229 days average · 69% over 60 days
- Wilshire, Los Angeles2,286 issued ADUs · 197 days average · 68% over 60 days
- Reseda – West Van Nuys, Los Angeles2,025 issued ADUs · 155 days average · 63% over 60 days
- Canoga Park – West Hills – Winnetka – Woodland Hills, Los Angeles2,021 issued ADUs · 155 days average · 60% over 60 days
Up: All Los Angeles permit timelines, Los Angeles officials, Local government
Sources & notes
Permit registryCity of Los Angeles Department of Building and Safety (LADBS) via City of Los Angeles Open Data
Open data endpointdata.lacity.org/resource/pi9x-tg5x.json
StatuteCalifornia Government Code § 66317 (60-day ministerial ADU review)
Data updatedNov 14, 2026